• Test the solar system’s installation accuracy
• Check for voltage in the wiring
• Verify the inverter’s operation
• Ensure the system is fully ready for use
• Remove construction waste and leftover materials from the site
• Ensure the worksite is clean and orderly
Final report
and project handover
We provide an Egenkontrol report, which includes:
• A photo report
• Detailed comments
Conduct a detailed assessment of the site:
• Building type and purpose (e.g., warehouse, office, shopping center, etc.)
• Roof structure specifics (e.g., metal, gravel, roofing felt, etc.)
• Drafting installation & connection plans
• Performing load calculations
• Preparing other essential documents
• Assist in organizing supplies and distributing materials for the project
• Carry out the installation of mounting systems and solar panels
• Perform inverter installation and connect the system to the inverter
Full-cycle solar system installation for commercial projects